The performance of these tasks is dependent on a range of related activities, described in the body of the analysis as subtasks. |
|
In practice, that may involve a lot of waiting around for others to complete their subtasks. |
|
A task with subtasks creates a task tree with the task as its root and the subtasks as its branches. |
|
Define the subtasks of your work, including the order in which things should happen. |
|
The main part of the report presents the collected 24 user scenarios, comprising 77 subtasks. |
|
This is particularly important at the tactical level where specific military tasks and subtasks are executed. |
|
Tasks can also contain other tasks entered in a hierarchical order of tasks and subtasks. |
|
Specify the importance of the task or subtask, that is, the priority it has in relation to other tasks or subtasks. |
|
Precisely, written test achievements enable the examinees to represent their performance strength in particular if they are familiar with the point-system of the subtasks. |
|
Work with experienced workers and observe and document all tasks and subtasks including those that are required during breakdowns, shutdown and start-up, and non-routine, but predictable, tasks. |
|
For operations in StarTeam that include several subtasks, there are core procedures, which include the subtasks required to accomplish a larger task. |
|
By default, the summary tasks are bold and outdented, and the subtasks are indented beneath them. |
|
A good task analysis starts by splitting up the job into tasks and subtasks and describing these in sufficient detail to be able to indicate the knowledge, skills and attitudes necessary for each subtask. |
|
In other words, the tool had to be able to support selected subtasks from a central platform and also be seamlessly integrable into the company's SAP environment. |
|
In this study, Alons is looking at such things as tasks and subtasks and related level of difficulty, quality standards, desired work rate and output targets. |
|
Indenting subtasks lets you quickly see the outline of your project. |
|
Programmers are developing software to divide computational tasks into subtasks that a program can assign to separate processors in order to achieve greater efficiency and speed. |
|
You can create an individual task or a task that has a set of subtasks. |
|
This field is not displayed for those tasks that already contain subtasks because the duration of a parent task depends upon the duration of its subtasks. |
|
Appropriate costs for the various subtasks in the work programme. |
|