The discharge at Khab, where the Spiti river joins Sutlej, was 213 cusecs, out of which the Spiti contributed 99 cusecs. |
|
True, he presided over the Cauvery River Authority and asked Karnataka to release 9,000 cusecs of water to Tamil Nadu every day. |
|
As compared to yesterday, when there was just 201 cusecs of water, water was passing through all eight spans of the Ghaggar bridge. |
|
As many as 33,000 cusecs of water has been released from Harangi reservoir since Wednesday evening. |
|
The inflow of water in Gobind Sagar today was 34,000 cusecs, almost the same that was yesterday and day before. |
|
According to an official release, water level was below the 4000 cusecs mark and it was receding further. |
|
The canal has a total capacity of 30 cusecs of water, which would irrigate about 11,500 kanals of wasteland under Warila Pass. |
|
According to Pakistan, the Baglihar dam would deprive it of more than 7,000 cusecs water a day destroying its agriculture. |
|
The Sutlej, which is flowing at 87,000 cusecs at Bonkar Dogran village on Wednesday. |
|
From the Pong reservoir on the Beas river the release should normally be between 8,000 cusecs and 10,000 cusecs. |
|
Its next best performance was in 1998 when the quantum of floodwater released touched a high of 10 lakh cusecs. |
|
In 2009, for example, the dry season began in March with a flow of 602 cusecs and ended in May with the flow of 897 cusecs. |
|
The maximum water discharge decreased to 10,817 cusecs last year. |
|
On 30 September 1986, the rainy seasonal flow was 16100 cusecs, which fluctuated between 28,773 and 53,595 cusecs in 1997 and 1998 respectively. |
|
Under the Treaty India may divert this flow when the incoming flow is 75,000 cusecs, leaving 35,000 cusecs for Bangladesh. |
|
During the recent floods, the spillway discharged an enormous quantity of seven lakh cusecs, still four lakh cusecs short of its designed capacity. |
|
The report from Ruacana notes an improving river flow of 214 cusecs. |
|
Indians say the barrage would maintain the water level up to 4,000 cusecs round the year, thus making river navigable between Baramulla and Srinagar. |
|
On 30 March 1986, the basin flow was 1250 cusecs during the summer season, and fluctuated between 451 and 261 cusecs on 30 March 1989 and 1999 respectively. |
|
Flow of water was 343500 cusecs at Tarbela, 461420 cusecs at Kalabagh, 536955 cusecs at Chashma and 576281 cusecs at Taunsa in River Indus. |
|
|
Water inflow in the dam was recorded at 26,000 cusecs while outflow was recorded as 45,000 cusecs. |
|
According to the press release, flow of water was 100000 cusecs at Noshera in River Kabal. |
|