A description of the transportation requirements for the superload and any other information that in the opinion of the General Manager is necessary shall be provided with the permit application. |
A traffic management plan shall be provided for all single trip permits for superload applications. |
It was something me and Superload takes to the road A HUGE 243 tonne box load crawled its way along North Wales roads over the weekend. |
A minimum of 10 working days is required to process a superload permit application. |