We are familiar with the falsework of a concrete building under construction. |
This also includes the basic assembly, dismantling and the transport of the formwork and falsework constructions or their components. |
Primary steel was erected on 360 tons of falsework and in a certain order because of construction loading constraints and cantilevers. |
At each end of the project, the deck design and layout are irregular, and for these areas a conventional falsework arrangement was used. |
When the eastern-most center element was erected and detailed, crews removed truss falsework. |
The erector designed and positioned the falsework to allow erection of catwalks and primary steel for the five center elements. |