In June, the 3600 automated tramming level, which will transport ore from the 1-D orebody to the T-1 production shaft, was finished. |
|
Trains are loaded and sent to the crusher according to specific tramming schedules designed, where possible, to blend grade variations. |
|
Scoop Care is designed to protect everything that is essential to the loading, tramming and hauling functions of an underground fleet, delivering preventive care that maximizes availability and productivity. |
|